LoRaWAN Civil Smart Gas Meter Data Analysis Intelligent Energy Management Meter Prepaid Meter Bill Payment

Place of Origin Hubei , China
Brand Name TimeWave
Certification ISO/IEC 20000-1,ISO/IEC 27001,ISO/IEC 9001
Model Number Type YW-TW
Minimum Order Quantity Negotiable
Price EXW price US$ 100-500/ set
Packaging Details Customizable packaging
Delivery Time 3-5 weeks after receive the payment
Payment Terms L/C, T/T
Supply Ability 500 sets per week

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Name Gas Meter Shell Aluminum/Steel Shell
Precision Grade 1.5 Application Civil
Highlight

Civil Smart Gas Meter

,

Intelligent Smart Gas Meter

,

LoRaWAN Energy Management Meter

Leave a Message
Product Description

LoRaWAN Civil Smart Gas Meter Data Analysis Intelligent Energy Management Meter Prepaid Meter Bill Payment

 

  • Product Overview

Intelligent gas meter is a new generation of centralized reading gas meter terminal. It is applicable to the flow measurement of natural gas, liquefied petroleum gas, artificial gas and other gasuujes. It integrates gas meter metering, remote reading and monitoring. The meter has the characteristics of high reliability, high accuracy and low power consumption.

 
  • Functions and features

1. Adopt LoRaWAN wireless technology. Effectively increase the anti-interference ability of the communication system and improve the

accuracy of the received data.

2. Timing (once a day)(settable) and key wake-up to transfer data to the platform. It improves the response speed of meter reading and
reduces battery energy consumption.
3. When the voltage is low or abnormal,the LCD screen will automatically display the fault information, beep the alarm, and close the valve.
4. It has a built-in antenna.The transmission signal is stable and reliable.
5. The platform can remotely check the user's gas consumption,battery usage,and remotely control the valve switch of the gas meter.
6. It has the function of pulse signal open circuit self-inspection,which can effectively ensure the accuracy of gas
meter measurement.
 
  • Specifications & technical parameters

 ​LoRaWAN Civil Smart Gas Meter Data Analysis Intelligent Energy Management Meter Prepaid Meter Bill Payment 0LoRaWAN Civil Smart Gas Meter Data Analysis Intelligent Energy Management Meter Prepaid Meter Bill Payment 1
                              Aluminum shell                                                                     Steel shell
 

Specifications G(J)1.6 G(J)2.5 G(J)4
Nominal flow(m3 /h) 1.6 2.5 4
Maximum flow(m3 /h) 2.5 4.0 6.0
Minimum flow(m3 /h) 0.016 0.025 0.040

 

Working Pressures(kPa) ≤30
Total Pressure Loss(Pa) ≤250
Accuracy Level 1.5 Class
Basic Error Lines qmin≤q< qt ±3.0% qt≤q≤qmax ±1.5%
The tightness of the machine It can last for 3 minutes without leakage under 1.5 times of the maximum working pressure
Operating Ambient Temperature(℃) -25℃~ +40℃
Inlet and Outlet Connector Threads M30×2
Maximum Display Capacity of LCD(m³) 999999
Maximum reading of base meter(m³) 99999.999
Power supply mode Four AA Alkaline dry batteries(AA LR6 1.5V)
LoRaWAN frequency band (MHz)
CN470,RU864,IN865,EU868,US/AU915,KR920,AS923_1/2/3/4,
Custom Channels
Barrier-free meter reading distance >3000m
Compliant standards

GB/T 6968-2019,GB/T 3836-202

 

 

  • Overall dimension (unit: mm)

LoRaWAN Civil Smart Gas Meter Data Analysis Intelligent Energy Management Meter Prepaid Meter Bill Payment 2

Specifications

W(mm)

W1(mm)

H(mm)

CC(mm)

L(mm)

        G1.6

152

62

227

130

172

        G2.5

152

62

227

130

172

        G4

172

72

259

130

192

        J1.6

170

69

221

130

202

        J2.5
        J4

 

 

 

  • Installation and usage considerations

1. The installation shall be carried out in accordance with GB/T 3836.15-2017 Explosive Atmospheres - Part 15: Design, Selection and Installation of Electrical Installations. The installation of meters shall be carried out by professionals of the gas company for initial installation and commissioning.

2. This product has undergone explosion-proof treatment and shall not be changed at will.

3. The product shall not be collided or severely impacted during transportation, and shall be protected from rain and sand.

4. This product should be stored in a ventilated and dry place.

5. It is prohibited to detect leakage in case of open fire. When piloting fire, the air in the gas meter must be exhausted to prevent accidents.

6. When installing the battery, note that the side with the spring is the negative pole of the battery. The battery shall be replaced under the condition of good ventilation and no gas leakage.

 

 

LoRaWAN Civil Smart Gas Meter Data Analysis Intelligent Energy Management Meter Prepaid Meter Bill Payment 3LoRaWAN Civil Smart Gas Meter Data Analysis Intelligent Energy Management Meter Prepaid Meter Bill Payment 4LoRaWAN Civil Smart Gas Meter Data Analysis Intelligent Energy Management Meter Prepaid Meter Bill Payment 5LoRaWAN Civil Smart Gas Meter Data Analysis Intelligent Energy Management Meter Prepaid Meter Bill Payment 6

 

WUHAN TIMEWAVE IOT TECHNOLOGY CO.,LTD

Website:http://www.tw-iot.cn/

Helpline: 400 8066 589

O&M hotline:19947604764

Address: 603,building1, Guanggudingchuanginternational, No.51GuangguAvenue, JiangxiaDistrict,Wuhan, HubeiProvince, China