Smart Prepaid Gas Meter Energy Metering Solution LoRaWAN With Real Time Data Analysis And Visualization

Place of Origin Hubei , China
Brand Name TimeWave
Certification ISO/IEC 20000-1,ISO/IEC 27001,ISO/IEC 9001
Model Number Type YW-TW
Minimum Order Quantity Negotiable
Price EXW price US$ 100-500/ set
Packaging Details Customizable packaging
Delivery Time 3-5 weeks after receive the payment
Payment Terms L/C, T/T
Supply Ability 500 sets per week

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Name Gas Meter Shell Aluminum Or Steel
Precision Grade Grade 1.5 Kind Pre-paid Gas Meter
Communication Mode LoRaWAN Reading Distance >3000m
High Light

Smart Prepaid Gas Meter

,

Real Time Prepaid Gas Meter

Leave a Message
Product Description

Smart Prepaid Gas Meter Energy Metering Solution LoRaWAN With Real Time Data Analysis And Visualization

 

  • Product Overview

Intelligent gas meter is a new generation of centralized reading gas meter terminal. It is applicable to the flow measurement of natural gas, liquefied petroleum gas, artificial gas and other gases. It integrates gas meter metering, remote reading and monitoring. The meter has the characteristics of high reliability, high accuracy and low power consumption.

Type YW-TW intelligent gas meter based on the IoT adopts LoRaWAN/CAT.1 wireless transmission technology. Automatically upload gas consumption data to the application platform to realize remote monitoring of gas meter usage status. It solves the problems of the traditional gas meter, such as the difficulty of over-reading the meter at home, the difficulty of paying the fee,and the inaccuracy of the supply and marketing difference.Explosion-proof sign ExibIIBT3 Gb. It is applicable to Zone 1 and Zone 2, containing IIA-IIB and T1-T3 explosive gas mixture.
 
  • Functions and features

1. Adopt LoRaWAN wireless technology. Effectively increase the anti-interference ability of the communication system and improve

the accuracy of the received data.

2. The gas meter adopts the form of system prepayment. The valve switch of the gas meter is realized by the command from the
system platform.
3. Timing (once a day)(settable) and key wake-up to transfer data to the platform. It improves the response speed of meter reading
and reduces battery energy consumption.
4. When the voltage is low or abnormal,the LCD screen will automatically display the fault information, beep the alarm, and close the valve.
5. It has a built-in antenna.The transmission signal is stable and reliable.
6. The platform can remotely check the user's gas consumption,battery usage,and remotely control the valve switch of the gas meter.
7. It has the function of pulse signal open circuit self-inspection,which can effectively ensure the accuracy of gas meter measurement.
 
  • Specifications & technical parameters
Specifications G(J)1.6 G(J)2.5 G(J)4
Nominal flow(m3 /h) 1.6 2.5 4
Maximum flow(m3 /h) 2.5 4.0 6.0
Minimum flow(m3 /h) 0.016 0.025 0.040

 

Working Pressures(kPa) ≤30
Total Pressure Loss(Pa) ≤250
Accuracy Level 1.5 Class
Basic Error Lines qmin≤q< qt ±3.0% qt≤q≤qmax ±1.5%
The tightness of the machine It can last for 3 minutes without leakage under 1.5 times of the maximum working pressure
Operating Ambient Temperature(℃) -25℃~ +40℃
Inlet and Outlet Connector Threads M30×2
Maximum Display Capacity of LCD(m3) 999999
Maximum reading of base meter(m3) 99999.999
Power supply mode Four AA Alkaline dry batteries(AA LR6 1.5V)
LoRaWAN frequency band (MHz)
CN470,RU864,IN865,EU868,US/AU915,KR920,AS923_1/2/3/4,
Custom Channels
Barrier-free meter reading distance >3000m
Compliant standards GB/T 6968-2019,GB/T 3836-2021

 

 

  • Installation and usage considerations

 

1. The installation shall be carried out in accordance with GB/T 3836.15-2017 Explosive Atmospheres - Part 15: Design, Selection and Installation of Electrical Installations. The installation of meters shall be carried out by professionals of the gas company for initial installation and commissioning.

2. This product has undergone explosion-proof treatment and shall not be changed at will.

3. The product shall not be collided or severely impacted during transportation, and shall be protected from rain and sand.

4. This product should be stored in a ventilated and dry place.

5. It is prohibited to detect leakage in case of open fire. When piloting fire, the air in the gas meter must be exhausted to prevent accidents.

6. When installing the battery, note that the side with the spring is the negative pole of the battery. The battery shall be replaced under the condition of good ventilation and no gas leakage.

7. Electrostatic hazard, so must be wiped with wrung wet cloth.

 

  • Packaging,Transportation and Storage

1. The gas meter is packed in a carton after being packed with shockproof foam material, and should not be directly affected by rain and snow during transportation.

2. Upward according to the sign to prevent to be harmed by crushing, impact and other damage, and should be carefully and gently when handling, and barbaric loading and unloading are not allowed.

3. The storage environment of the gas meter should be dry, well ventilated, no corrosive gas, the ambient temperature is -25 °C ~ +60 °C, and the relative humidity is 45%RH~75% RH.

  • Note

1. It is not allowed to replace components or structures that affect the explosion-proof performance at will, so as not to affect the explosion-proof performance.

2. Warning sign: Potential electrostatic charge is dangerous. During the normal use, maintenance and cleaning of gas meters, we should avoid the ignition hazard caused by electrostatic charges. Do not touch and wipe the equipment when it is used in explosive environment. If it is necessary to wipe and touch, it should be carried out in a well-ventilated, no gas leakage place. Wipe the shell with a wrung wet cloth. And it is strictly forbidden to wipe the shell with a dry cloth!

3.3. The battery must be replaced with the same type of battery under the condition of good ventilation and no gas leakage.

Smart Prepaid Gas Meter Energy Metering Solution LoRaWAN With Real Time Data Analysis And Visualization 0Smart Prepaid Gas Meter Energy Metering Solution LoRaWAN With Real Time Data Analysis And Visualization 1Smart Prepaid Gas Meter Energy Metering Solution LoRaWAN With Real Time Data Analysis And Visualization 2Smart Prepaid Gas Meter Energy Metering Solution LoRaWAN With Real Time Data Analysis And Visualization 3